Real EstatePublic assets

CD43 — Haute-Loire

CD43 deploys Oxand Simeo™ for a multi-year investment plan that is dynamic, defensible and adjustable.

CD43 — Haute-Loire
170+
Buildings
68
Sites
206,000 m²
Of floor area

Context

The Haute-Loire departmental council runs a large and varied property estate: more than 170 buildings across 68 sites, over 206,000 m². The department wanted to map the condition and risk level of that estate, model how it ages, and answer a specific request from its elected members — a year-end roadmap showing the investment trajectory at short, medium and long range.

Our solution

  1. 01 Structure and consolidate the knowledge The estate knowledge structured and consolidated on one reference.
  2. 02 Establish the survey A survey of the estate's performance: condition and risk level as they stand.
  3. 03 Simulate the scenarios Maintenance and investment scenarios simulated at short, medium and long range.
  4. 04 Deploy into the organisation A deployment plan for Oxand Simeo™ across technical and estate management: training, use cases, an organisation note.

What Oxand delivered

An estate structured and digitalised

One base where the knowledge had been scattered.

Projections on a predictive scenario

Multi-year projections of maintenance need, resting on a predictive scenario.

Grounds that hold up in the chamber

A dynamic solution producing objective, defensible grounds for decision — which is what the elected members asked for.

Questions about this reference

What estate does the department manage?

More than 170 buildings across 68 sites, over 206,000 m² of floor area.

What is maintenance debt?

The value of deferred work still needed to bring an estate back to a given condition. Naming it turns a diffuse backlog into a figure that can be discussed and planned.

What does defensible mean here?

That the investment trajectory rests on a model and on traceable data, and can therefore be presented to elected members and defended in session rather than argued from experience.

What does modelling ageing add?

It says when a building will reach a given condition, and therefore when work becomes necessary — instead of scheduling it by the calendar or after the failure.